Shenzhen Puxin Technology Co., Ltd.

successful anaerobic digestion system

successful anaerobic digestion system
Product Detailed

excellent anaerobic digestion system
1.High biogas yield
2.Low cost
3.Two days of construction100% success
4.Excellent s

Detailed Product Description
excellent anaerobic digestion system
1.High biogas yield
2.Low cost
3.Two days of construction100% success
4.Excellent safe

excellent anaerobic digestion system

 

1. Introduction  

 

     PUXIN Household Household biogas digester system for waste treatmentis composed of a 6 or 10 m3 PUXIN biogas plant, pipe routes, gas purify devices and gas appliances or small power biogas generator.

      PUXIN Household biogas digester system for waste treatmentismainly applied to farmhouse or domestic house to treat livestock waste, straw, human sewage and food waste.

 

2. Contrast between fixed dome and Puxin biogas plant

 

                    Contrast of the technical requirements for the builders

 

Items 

The traditional fixed dome  hydraulic biogas plant 

The Puxin Biogas plant

Airtight craft 

Highly required 

Not required 

Ability to understand blueprint 

Highly required 

Not required 

Ability to build the arch 

Highly required (build by hand) 

Not required (cast by mould) 

To judge and deal with gas leaking 

Highly required 

Required 

To judge and deal with water leaking 

Highly required 

Required 

Training period 

About 3 month 

About one week 

Period to become a proficient builder 

1-2 years 

About one month 

Requirement of the people to be trained 

Medium educated, strong ability to master skills 

Not Educated, medium ability to master skills 

Success rate 

Not 100% guaranteed 

100% guaranteed 

 

 

Contrast of the maintenance

 

Items 

The traditional fixed dome  hydraulic biogas plant 

The Puxin Biogas plant 

To mend the gas leak of gas-holder   

Dangerous and difficult

The job is done inside the biogas digester, there is a possibility of poisoning.

The leak can not be found. 

Safe and easy

The job is done on ground, there is no possibility of poisoning. The leak can  be seen, and can be mended  directly. 

To mend the water leak of the digester

Dangerous

The digester’ outlet is too small that the air circulation in the digester  is bad. So, there is a possibility of poisoning.

Safe

The digester’s outlet is large enough that the air circulation in the digester is good. So, there is no possibility of poisoning.

 

  

 

3. Construction process

 

 

4. Cost breakdown of 10 m3

 

Material (manpower)

quantity

Glass fibre reinforced plastic Gasholder

1

Smashed stone

4m3

Sand

3.5m3

cement

1400kg

Brick(60×120×240mm)

100

Plastic pipe (Φ150×1800mm)

2

concrete bar (Φ6)

8kg

manpower

6 man×1 day (digging a hole)+

6 man×1 day (casting concrete)+

2 man×1 day (to build inlet, outlet and install pipe systems)

Earth work

40 m3 (steel mould with outer)

 

 



Copyright Notice @ 2008-2022 B2BAGE Limited and/or its subsidiaries and licensors. All rights reserved.